Re-moved

Once in a while, dorm halls have leftover empty rooms after all the reshuffling and assigning is complete. It just so happens that some halls have more than others – namely, the highest and most countercultural floor in an 80 year old building without elevators. Thus, with four people in two double rooms and four rooms empty, the Powers that Be decided to unroll said double rooms.

And so I’m here. The room next door, actually. I’ll probably stay here for the next n semesters or until I get sick of climbing stairs. Naturally, I have pics.

Actually, one only fit with the help of a Sparta kick. Moving stuff around was convenient, since all the furniture is the same. I found it easier to just move drawers or whole shelves with my stuff still on it.

What's that? Serendipitously, I found this hiding in a corner of a mirror. Gee, what a fortune.

The solution: develop a brain-to-ethernet interface. No, I don’t mind sleeping next to an outlet, I swear. Or an ethernet drop. The layout of plugs and jacks in this room is haphazard beyond anything. No furniture fits anywhere without blocking something!

I had a brilliant plan of moving the computer desk to this location and scooting the bed outwards such that it was one comfy internet couch of sorts. That plan faded when I discovered the bed isn’t height-adjustable and would block the keyboard slide and all the drawers.

The world is actually colorless; the fire alarm is the only source of color. Wow, what’s a power outlet doing up THERE? I suppose it’s just asking for some kind of multi-storey loft… Hmmm….

I like this room, actually. Not the least of reasons, of course, is because it’s a single room. Now it’s time to deck out the walls with thin-film displays!

Oh, this post was interrupted at about 1:35 because someone set off the fire alarm and we all had to evacuate. Oh well.

 

Test Bot 4.5

It has come to my attention that I don’t really have any “good” pictures of TB4.5, since my camera died a few days into the build session and the rest was taken using friends’ cameras or the cell phone, which sucks.

So now that I do have a replacement for the old cam, here are some pics of TB on the best surface I could find in this general vicinity – a bright, patterned carpet. Of course it’s a good photographic background!

Front view Rear view

Looking back on my build pics (the reports themselves are lost to history), TB4.5 has so far been my magnum opus of design and engineering. The sheer amount of work I did on this bot in about one month is insane. I was pretty much only able to start after the FIRST Robotics season ended, which was exactly a month before BBIQ.

And the best part? It all worked, and the only reason I wasn’t more successful was because I waited too long to order batteries (this doesn’t let Maxamps off the hook because they took another week to tell me they had no stock) and ended up having to run on cheese-o-cells which failed mid-tournament.

TB4.5 will be revived and reworked for local tournaments. Look for Test Bot 4.5 Service Pack 1 some time soon!

 

BLINKENLIGHTS

It doesn’t really need that much work – the electrical system is active, minus the arm controller which I borrowed at the tournament. A new lifting arm beam and linkages need to be machined, in addition to a new gear for the drill motor, which has two snapped teeth from all the drumbot punting.

 

Bot on!