Archive for December, 2009

 

the nü \m/edia läβ

Dec 16, 2009 in MIT, Bostoncaster, Cambridgeshire, Stuff

For the past z years, MIT has been trying to build another Media Lab. They finally succeeded in 2007, and construction started coincidentally about when I first got here, which really means I’ve put up with daily construction noise for essentially forever.

As well as cranes looming ominously overhead.

Anyways, the new building opened on December 2nd. Moving day was uneventful besides metric asstons of grunt work, and everybody is now happily set up in their new spaces. Let’s take a peek around…

About now is when I wish I had a wide-angle lens. I can’t fit the entire building into one frame without occupying the same physical space as either a sign or a parked van.

The new building is an impressive exercise in the “metallic gray, glass, and Faraday cage” school of design. The metal curtains make for excellent cell phone filter – you can’t get any reception up until the 5th floor or so.

That’s right.

I can only describe the interior of the building as an heterogenous mix of mental health facility, kindergarten, and research laboratory.

…which I guess sums up the Media Lab pretty well.

The entryway is a lounge and reception type area that opens up to a 4 storey lobby.

Said lobby is surrounded by walkways and 50 foot wide windows into adjacent spaces. The theme here is “transparency”. Remember that. MIT is good at transparency.

So those elevators are still under construction and just sort of hanging out there, right? Nope. They have all their mechanisms in plain view! Mechie buffs (like yours truly) will spend (have spent) inordinate amounts of time staring at the elevator hardware.

Seven or eight major lab spaces & offices peer out into the cavernous lobby.

Labs and buildings tend to be named after major donors to the construction effort. So I thank Mr. G. Hayek Swatch for… uhhh… having a pretty badass name. Among other things, I’m sure.

This is it. Major lab spaces in the building are built around two-floor conjoined spaces, referred to as cubes. They are patterned after the original Media Lab “cube”, a colloquial name for the large two-floor office-lined common space in the basement. There was only one cube in the old building and everybody wanted it.

Adjacent spaces have walkways and… observation decks? Zoo windows? Surveillance cells? Something. Windows between the labs allow you to peer at what’s going on in the next salt mine over.

So here’s how shit goes down™.

Smart Cities (my associated group) moved from the aforementioned Original Cube to the… 3rd floor? They put the guys who build cars on the 3rd floor?

Whatever. There’s more space, which is exactly what we need, besides an overhaul of parts organization systems, but hey. There’s also a walk-through, 5 ton freight elevator. I suppose that works too.

Here’s the full-size Citycar prototype and the half-scale minicar. In the left background is Roboscooter, my custodial project for the past k semesters.

This thing is so fly it’s on autopilot.

(It actually COULD be, I suppose…)

I’ve also been involved pretty deeply with the mini-bubblecar. This half scale, almost Powerwheels sized model features a body shell mockup, functioning quasi-omnidirectional drivetrain, and shows off the folding frame design. That is, it does everything which is too damned expensive to do on the real one.

It’s piloted by remote control, but…. Powerwheels sized. Come on.

Finishing details get added even as the tenants hack away.

Another cube area.

Old connects to new on all floors except the basement (and the 5th and 6th floors of the new building, because there isn’t a 5th and 6th floor of the old).

SEGFAULT Update 7: The Hub of the Universe

Dec 15, 2009 in Project Build Reports, SEGFAULT

You can’t have drive wheels without hubs. Before I slinked back to Atlanta for two weeks, I wanted to get Segfault at least off the ground on its own two wheels. I have yet to actually lay out the control electronics or devise a way to center the steering column.That will probably happen after I return, since I’m not taking all of MITERS with me (but I’m guaranteed to, given the opportunity, trust me.)

To make large wheel hubs, you need large chunks of metal.

Which I have plenty of. The hubs were designed on the fly and are made from a 3″ diameter round of aluminum. I quickly popped off the basic shape and external features on the MITERS Old Mercedes (so called because of its completely beat-to-shit but flawlessly reliable nature) before transferring to the mill to drill the bolt circle.

Here’s an idea of the fit. After putting in the bolt circle, I took a trip over to the Formula SAE team shop and borrowed a keyway broach. The KOOOOOOOOOOOOOOOOLmorgen motors have  a 1/2″ keyed shaft, and I figured that using the existing keyway was better than hacking my own solution, or keypepgging.

No design of mine is complete without a Giant Set Screw. So here it is, sitting directly over the keyway. I discovered that the Bridgeport spindle has enough rotational inertia in low gear to crank a 1/2″ tap through half an inch of aluminum just by coasting.

That is why I am dismayed by “miniature” machine tools.

The wheels bolt on and…

AAAAAAAAAAHHHHHHHHHH

IT’S BALANCING ITSELF!

No, just kidding.

Here’s a view of the drive wheels, as featured in an earlier episode of Charles’ Amusing Non-Academic Distracting Adventures (CANADA). There is no additional support past the motor shafts, so here’s hoping those KOOOLmorgen motors have really stiff bearings.

Alright, so this thing isn’t really any good without handlebars to hold onto. At this point, I pulled out a diversionary project that I embarked on a few weeks ago to explore new means of lazily putting together pieces of metal.

The handlebars, just some pieces of 7/8″ diameter bike frame tubing, are attached. Hey, what’s that holding them on there – are those fillet welds?! Did MITERS finally get a TIG welder?

Has Charles finally broken down and welded something together, knowing that some times, sturctural integrity is more important than the ability to be easily disassembled?!

No, and yes. I remembered the existence of low temperature aluminum brazing solutions and decided to give it a run. The most promiment label in this field seems to be Durafix. Basically, the alloy rod is a high aluminum-content zinc material that melts at around 750°F and flows over bare aluminum metal. You’d heat the metals to be joined to greater than 750 degrees, higher seemingly better, then rub the rod over the joint to break the oxide layer. Using a stainless steel wire brush and abrading the joint results in better flow because the oxide layer disintegrates under mechanical pressure. The process is flux-free.

I have a hard time coming to terms with the no-flux part, but have also been having trouble finding high temperature (700+F) aluminum soldering flux. The vast majority seems to be designed for lead-tin soldering of aluminum which occurs at lower temperature. Whatever. The dude in the demo video could do it, so I can do it, right?

I saw that McMaster listed a similar “zinc-aluminum solder” in their catalog. I’m a stickler for instant gratification, and McMaster is about as close to instant as I’ll get this stuff. It came in a tube, in the form of bunch of 1/8″ diameter rods.

Leap of faith! Using my newfound joining abilities to put together random pieces of scrap aluminum, I discovered that…

  • You really need to get the parts HOLY FUCK HOT. After sufficient heat is applied, the stuff just sort of flows itself across the joint without much assistance. The problem is the HFH requires a massive heat source, and much time (like sitting there holding the torch for a minute or two), and so far, my torching ability is only limited to small or thin parts. The 1/8″ thick pieces took forever.
  • It seems too viscous to “wick” into tight joints, at least without the help of flux. It’s great for fillet and butt joints, but I don’t see it filling the entire inside surface of, say, a lap joint.
  • No, it’s not welding. There’s no mixing of the alloy with the parent aluminum, unless you melt the aluminum. Then you’re doing it wrong.
  • No, using a soldering iron doesn’t work, not even if your soldering iron is 15″ long, has a copper tip an inch in diameter, and has a 300 watt heating element. Clearly it just needs overvolting.

With that established, here’s the joint on the control box!

Eww. This is probably the most obnoxious overuse of the stuff on the planet. It looks like more of it got on irrelevant surfaces than in the actual joint. I think I dumped at least a third of a rod onto this thing.

What made it worse was that I didn’t have a good set of wire brushes. I totally wrecked two cheap plastic ones because… well, once the stainless wire gets hot, they just sort of melt off.  To do this right, I’d need a good set of wood or metal handled brushes.

As I hinted at before, the tab-and-slot construction of the control box itself is *very* amenable to this type of unwelding.

That looks MUCH better.

I did a few things differently on this joint. I thoroughly sanded and brushed down both surfaces so there is minimum surface oxide present. I held the torch to the pieces for about two minutes, and made sure the whole joint was evenly heated by moving the torch around. This was tested just be pushing the rod against the joint to see where it melted the easiest. Then I added the alloy kind of like how you’d add filler metal to a TIG joint (slightly hard to describe past “poke-swirl-move-repeat”) .

The process was repeated for the inside joints. I made sure that there was metal holding onto metal on both sides of the control box (i.e. it’s two fillets, not just a butt joint).

That worked substantially better, and it was without in-process brushing. Still a bit globbier than I’d like it, but that’s something which gets better with practice.

Completed control box!

I’m very satisfied. Time will tell how my crazy unwelding job holds up.

Alright, it’s glamor shot time!

Yes, this picture is totally posed. How’d you know?

And one more, showing the SHIIIIIIIIIIIINY aluminum top plate.

SEGFAULT Update 6: The Impending WHEE-SPLAT Gets Closer

Dec 05, 2009 in Project Build Reports, SEGFAULT

With the balancing circuit prototype demonstrating consistent and non-glitchy angle indication, I’m picking up the slack on the mechanicals. Work continues with the frame being fully assembled, motors mounted, and the tilting handlebar essentially finished! I’m now just missing the handlebar tubes themselves and some big chunks of aluminum to carve the wheel hubs out of.

Things are on track for the Maiden Faceplant some time in early January. Meanwhile…

When you make fancy waterjet-cut puzzle frames, you shouldn’t forget, like me, to lay out the fastener holes that will put them together.

In this case, I accidentally the front and rear structural screw holes. So it was back to the old center punch and caliscribing, followed by some quick drill press work. Manual fabrication… can you imagine that?

While I had the temporarily-fastened frame taken back apart to drill the new baseplate holes, I decided to fill the empty motor cages with motors. The KOOOOOOLmorgen motors are sandwiched between the two rails, mounted on both ends for maximum load carrying ability. I need high stiffness in the motor mounts because of the single-supported axles.

Rinse and repeat for both motors. After adding the requisite hardware, I should not have to fiddle with the bottom structure ever again. At least, until something breaks.

In this image, the “pillow blocks” for the tilting handlebar are already mounted in place. Said handlebar assembly will pivot at this location a few degrees to either side, and the rotation will be read by a potentiometer and translated into a differential motor speed to let the vehicle turn.

The pivot pin is a 1/2″ steel rod with a milled flat to position the handlebar and an axial center hole to couple to the feedback pot.

By pure chance, I managed to select a piece of 1/2″ alloy or tool steel. What a total bitch to machine – I had to break out the carbide to mash through it- but the shaft took on an almost polished appearance after a run through with 1000 grit sandpaper. I guess that’s why they grind tools instead of mill them?

The complement to the above is a single 40″ stick of 80/20 structural extrusion, the 1″ flavor. Conveniently enough, the extrusion has a center hole that is the correct diameter to be tapped 1/4″-20. This meant I had a set screw attachment solution practically ready to go.

To interface this with the pivot pin, I just crammed a 1/2″ cutter through the extrusion from one side to the other.

A view inside. Visible are the pivot pin (kinda…), its +2 Set Screw Holes of Potentiometer Retaining, the 80/20 handle stick, and some spacers. A big cap screw is cranked down the center hole to lock the pieces together.

Another view of the assembly. I need to come up with a way to spring load the stick such that it tends to center itself. I actually couldn’t scrounge either 1) two matching springs or 2) stiff enough springs or 3) springs of a workable physical dimension, so a hardware store run will be made in the near future.

Without the centering, I’d have a hell of a time actually trying to operate the thing.

On the other end of the handle stick is the control box. It’s retained by a single cap screw, threaded into the 80/20 center hole. This isn’t particularly structural, but… it doesn’t need to be. Right?

The control box will never have to support the full vehicle weight, or any number over, right?

Right? :(

Oh, the 4 perimeter holes don’t serve a mechanical purpose – they are only there to pass wires through. They are at the same distance from the center as the cavities in the 80/20 X profile, to encourage clean wiring.

Speaking of the control box… I finally got my SHINY ALUMINUM KNOBS from my most recent favorite Sketchy-ass Ebay Electronics Dealer (SEED). I purchased a grand total of 20. They’ll be useful for future knobbery, but Segfault only needs 3. The other Big Knob was scrounged. Besides the knobs, the same order brought in a handful of multiturn trim potentiometers and a stack of single-sided protoboard.

So the user interface is now complete, with exception of the power switch. Can you find the power switch? I can’t either right now, because it doesn’t exist, but the ultimate goal is to hide it in the most obscure location possible, characteristic of older electronics equipment (designed by engineers rather than product designers, I imagine). For instance, all the MITERS oscilloscopes have their power switches integrated as a small selectable section of the scale illumination & beam intensity knob, hidden amongst the other knobs.

Here I am trying to think of some dastardly way to make the zero adjustment screw on the degree-o-meter the main power switch.

Okay, enough is enough – here’s where SEGFAULT stands (LOL PUN) as of today.

Missing: things which herd electrons, wheels, and handlebars. And cool glowy lights.

I’ll be making the wheel hubs soon, hopefully out of one of my “stock” hugeluminum billets. The handlebars are easy – they can be just about any steel or aluminum tube. I should at least be able to stand on this thing and practice static balancing soon. Then it’s back to the electronics!

Here’s a “global perspective” picture  showing the proportions of SEGFAULT in relation to other things in MITERS. It’s a good 4 feet tall without wheels.  The handlebar position will be higher than real Segways, if nothing else but to lessen the sensation of standing on a pogo stick.

MORE TO COME!