Reporting from the airport…

Friday, December 21st, 2007 @ 0:17 | MIT, Bostoncaster, Cambridgeshire, Stuff

Since I’m at Logan International Airport, it’s obligatory that my post have some of these.

Merry Christmas.

 

Recently

  • The Belated Overhaul 2 Design & Build Series, Part 7: Cleaning Up the CAD Details, Sending Parts for Manufacturing
  • The Overhaul 2 Design & Build Series, Part 6: Electronica
  • The Overhaul 2 Design & Build Series, Part 5: The Top Clamp Arm and Actuator CAD-o-rama
  • The Overhaul 2 Design & Build Series, Part 4: Ramps, Forks and Clamps, the Pointy Things CADpocalypse
  • The Overhaul 2 Design & Build Series, Part 3: The Drivetrain and Lift System CADnado
  • The Overhaul 2 Design & Build Series, Part 2: How to Design an Overhaul!
  • The Overhaul 2 Design & Build Series, Part 1: How to Overhaul a Design
  • Presenting the Overhaul 2 Design and Build Series
  • Beyond Unboxing Returns with some #Season2 Shenanigans: Axent Wear Kitty Ear Headphones!
  • Welcome to Big Chuck’s Little Robot Warehouse!
  •  

    Comments are closed.